High Cost Of Materials And Land Acquisition Problems In The Construction Industry In Ghana

dc.contributor.authorDanso, Humphrey
dc.contributor.authorManu, Dorothy
dc.date.accessioned2026-02-10T09:30:16Z
dc.date.issued2013-03
dc.description.abstractThe main purpose of the study was to investigate the major causes of high cost of building materials and land acquisition problem which was part of a larger study that assessed the problems in the construction industry in Ghana. Data were collected from 16 contractors, 36 engineers/architects and 16 consultants through self-completion questionnaire. The findings reported were based on five-point Likert-type items relating to causes of land acquisition problem and high cost of building materials problem. Descriptive statistics, one-way analysis of variance at 0.05 level of significance and Gabriel′s post hoc test were used to analyse the data. The results indicated that the highest ranked item of cause of land acquisition problem was sale of land to multiple users, and the highest ranked cause of high cost of building materials was high cost of manufacturing of materials in the construction industry in Ghana. Recommendations for Government and Authorities in the construction industry have been discussed. The study contributes to the literature on construction management in the context of developing countries.
dc.identifier.citationDanso, H., & Manu, D. (2013). High cost of materials and land acquisition problems in the construction industry in Ghana. International Journal of Research in Engineering & Applied Sciences, 3(3), 18-33.
dc.identifier.urihttps://ir.aamusted.edu.gh/handle/123456789/143
dc.language.isoen
dc.publisherInternational Journal of Research in Engineering & Applied Sciences
dc.subjectconstruction industry
dc.subjectland acquisition
dc.subjectcost of building materials
dc.subjectcontractors
dc.subjectconsultants
dc.titleHigh Cost Of Materials And Land Acquisition Problems In The Construction Industry In Ghana
dc.typeArticle

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
High_Cost_of_Materials_and_Land_Acquisit.pdf
Size:
613.06 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description: